Wind Farm „Derala 87 MW“

April 2022 There are two potential scenarios for the realisation of this project, one that includes the installation of 29 Vestas turbines with a total cost of EUR 109 million and the other that includes the installation of 29 China turbines with a total cost of EUR 78.9 million. The preliminary choice of turbines, as it now stands, is Vestas V 112, 3.0 MW, 119 mph with 87 MW of installed electric power. The total investment will depend based on the set of turbines used and it will amount to EUR 109 million for the Vestas or EUR 78.9 million for the China turbines. Thus far, this project has…

Regional Food Centre, Sarajevo

April 2022 The construction of a regional food center is a project whose idea is to elevate agriculture as a sector of the economy to a much higher and more organised level, with modernization and all the necessary content in one place. It is located in the city of Sarajevo, and the realization is already underway with the designated land for facilities and all necessary documentation. The project is being implemented by “KGI Konstrukt” d.o.o. Sarajevo, is one of the leading financial engineering and construction companies in Bosnia and Herzegovina. The company was founded in 2003 and continues…

Buroj Ozone - Tourist City Trnovo (Trnovo Municipality)

April 2022 Buroj Ozone – Tourist City Trnovo is one of the largest real estate investment projects currently active in Europe. Located on the Bjesasnica Olympics Mountain, in the village of Dejcici, Trnovo Municipality, and only 20 minutes away from the International Airport in Sarajevo. The City covers an area of one million square meters. Along the skyline of heavenly surroundings with fresh-water rivers and magnificent mountain ranges, it is the perfect place filled with greenery. The project is being implemented by Buroj International Group, one of the leading international property development…

Railway Track Overhaul

April 2022 The railway system of Bosnia and Herzegovina has fallen into decay and has not been systematically overhauled since 1968. Railway overhaul project is a must for Bosnia and Herzegovina and presents one of its most crucial steps in modernising travel infrastructure. This is the reason a major emphasis has been put on the project that will be carried out by the Public Enterprise Railways of the Federation of Bosnia and Herzegovina Ltd. Among other things the Railways of the FB&H conduct the maintenance, modernisation and construction of railway infrastructure and activities that serve…

Wind Parks Slovinj of 130 MW and Dzeva of 46 MW

April 2022 “Elektroprivreda Bosne i Hercegovine”, “Elektroprivreda HZHB Mostar” and “Elektroprivreda RS” entered into a 263 million EUR investment cooperation for the construction of two wind parks in the Glamoc municipality. The implementation period for its construction is 10 years whereas the payback period is set at 12 years. At this time, the construction permit is in the issuing procedure.   

Residential, Business and Shopping Centre Sigma, Sarajevo

April 2022 The Residential, Business, and Shopping Center Sigma is a promising project located in Butmir, Ilidza Municipality, City of Sarajevo. It is located near the Sarajevo International Airport and the city centre. The project is being implemented by Hidrogradnja d.d. Sarajevo, is a construction company founded in 1947. During a more decennial work, Hidrogradnja d.d. Sarajevo has engaged in the construction of low and high-rise buildings, as well as the production of fractions, concrete and concrete products. The company is in the process of preparing a reorganization plan and looking for…

Eco-Zone Koricani, Vlasic

April 2022 This is a multi-entity project located in the Koricani village whose administration consists of the municipality of Knezevo, the entity of Republika Srpska, and also the Municipality of Travnik, the entity of the Federation of B&H. The location is designated as a protected ecozone. All necessary infrastructure, paved roads, electric net and water supply have been already provided. The Eco-Zone has obtained all the necessary approvals from the competent governmental authority regarding the construction of the Eco Centre. The project involves the construction of an aqua centre, educational…

Pulse Detonation Jet Engine Vujin

April 2022 The pulse detonation jet engine Vujin is an investment project in the field of innovation. It is in its development phase and involves the construction of a completely new propulsor, without moving parts, which can make more efficient use of the chemical energy of the input fuel, with low harmful emissions, without the use of motor oils and, therefore, more environmentally friendly than the existing chemical propulsors. The secondary object of the invention is to construct a hybrid propulsor, which, when needed, can be used as an external oxidant from the atmosphere or an internal oxidant…

Wind Farm Skadimovac of 110 MW

April 2022  The aforementioned potential of the Glamoc municipality for wind energy is best described by the existence of two separate multi-million euro projects. This one is aimed at erecting a wind farm capable of annually producing 340,000 MWh. The procedure of measuring the wind speed was completed in the period from November 2012 to November 2014. Based on this data, the Naval Institute in Zagreb, Croatia has developed the preliminary design of the wind farm Skadimovac. Thus far, this project has secured the following documentation and permits: (1) the concession agreement with the Government…

Wind Park Galica

March 2022 Set in one of the most attractive winter and summer mountains in Bosnia and Herzegovina, right at the heart of the Dinaric Alps, the Galica Wind Park is planned to produce 253,230 MWh with an installed net electric power of 2 x 50 MW. Its approval status is currently in progress. The following documentation has been completed thus far: (1) a feasibility study for the use of wind power for electricity generation in B&H, (2) a geotechnical study, (3) an ESI Assessment, and (4) the 110 KW substation design.  In addition, the grid connection and ecological study have been approved.…

Eco-Village of Grabovica, Tomislavgrad

March 2022 The Eco-Village of Grabovica was founded in 2007, and it has been open for tourists since June 2013. The visitors can enjoy the natural beauty of Busko Lake and the residents’ hospitality and spend an active vacation in the beautiful landscape of the rural idyll. The Busko Lake, at an altitude of 700 meters, has an area of 55.8km², and it is one of the largest lakes in Europe. The lake is located on the border between Bosnia, Dalmatia, and Herzegovina, so its natural position and climate conditions are the reasons why it attracts so many tourists. The first phase of Grabovica Eco-Village…

5 Star Hotel “Skenderija“, Sarajevo

March 2022  The project involves the construction and renovation of the Skenderija’s plateau (square) and the Ice Hall located in the Sarajevo city centre, on the left bank of Miljacka river. The construction of the Skenderija Centre has begun in June 1967, and it was officially opened on 29 November 1969. The Skenderija Centre covers an area of 70,000m² with multi-purpose halls used during a year for hosting and organization of various sports, cultural, economic and trade fair manifestations. The Centre also includes the “Commercial City” shopping centre with numerous shops, restaurants,…